Waste Transfer Station Tag

Modular construction Modulo concrete modules that form the base of the recycling facility including finished bathroom/bathrooms and meeting room/ education /room were installed within 5 days. Recycling and a creative studio for teaching Under the 9.8 ft high modules a lot of space

Two transfer stations installed by Modulo within 4 days and being used already. Both structures are located under the A86 motorway for optimized space use. Modulo was the preferred solution because it could be installed in a very short time