








Project Details
Municipality:
Stadtreinigung Gemeinde Hamburg
Location:
Hamburg, Schnackenburgallee/ Rondenbarg
Installation:
2013
Site specifics:
3.500 m2
Nuber of blocks:
116
Usable space underneath the deck:
858 m2
Number of bins:
20 @ 40 m3;
8 spare bins
7 canal drop areas to facilitate drop off on the deck and collection under the deck.
Description
Hamburg desired a sustainable flexible, multi-functional solution providing them the best life time costs performance. The site has heattraced ramps, roofing, and facilitates offices, storage , reuse and HHW underneath the deck. The site is in compliance wit all European and German Regulations (Guidelines for Environmental Protection Measures and Chemical Waste Storage, National and International Fire Codes). It has all fire safety features, including 3 hours fire rated walls, fire rated self closing doors, spill containment with self –contained sumps, chemical resistant removable gratings, certified electrical , electrical centre connections, outlets, emergency eye/face wash station, lockable doors, emergency lights, exterior lightning, insulation , heating and temperature control, ventilation, shelves, access into each compartment, warranty.
Aditional info:
1.790.000 residents / ± 778.500 households. Hamburg owns and operates 12 drop off centres!