garbage drop off centers

On July 23 Candiac, Quebec selected Modulo to supply and install the patented modular Modulo EcoCentre/ public drop off solution.  The ecocenter will be installed early September 2019, which is less than 2 months after the contract award. Modulo is steadily

Two transfer stations installed by Modulo within 4 days and being used already. Both structures are located under the A86 motorway for optimized space use. Modulo was the preferred solution because it could be installed in a very short time